 | A horizontal surface is prepared to ensure a level base. |  | Rebar is installed on the level surface. |
 | An embedment ring is craned onto the rebar. |  | The embedment ring is levelled on the rebar. |
 | More rebar and cable conduits. |  | The concrete arrives and is fed to a pumper. |
 | Concrete is pumped for the foundation. |  | The concrete is poured in place. |
 | Trowelling the concrete. |  | A finished foundation. |
 | Installing the vault to house the turbine transformer. |  | Installing the substation. |
 | Safety first at substation. |  | Ship from Denmark unloading turbines in Owen Sound. |
 | Blades and tower section on the dock. |  | Blade container and tower. |
 | Assembled rotor. |  | First nacelle arriving on Huron Wind site. |
 | Installing the first nacelle. |  | Nacelle on top. |
 | Rotor and crane. |  | Rotor installation. |
 | First turbine assembled. |  | Huron Wind taking shape. |
 | Sunrise over the wind farm. |  | Sunrise over the wind farm #2. |
 |