A horizontal surface is prepared to ensure a level base.Rebar is installed on the level surface.
An embedment ring is craned onto the rebar.The embedment ring is levelled on the rebar.
More rebar and cable conduits.The concrete arrives and is fed to a pumper.
Concrete is pumped for the foundation.The concrete is poured in place.
Trowelling the concrete.A finished foundation.
Installing the vault to house the turbine transformer.Installing the substation.
Safety first at substation.Ship from Denmark unloading turbines in Owen Sound.
Blades and tower section on the dock.Blade container and tower.
Assembled rotor.First nacelle arriving on Huron Wind site.
Installing the first nacelle.Nacelle on top.
Rotor and crane.Rotor installation.
First turbine assembled.Huron Wind taking shape.
Sunrise over the wind farm.Sunrise over the wind farm #2.
Click on thumbnails to view images larger
IMAGE USAGE
Permission is granted to use these images for the editorial purposes relating specifically to the Huron Wind project only. Any other use, electronic or otherwise, is prohibited unless written permission is obtained from Huron Wind.


home | the project | fact files | news | images | education | media | contact us | links

  copyright © 2002 Huron Wind all rights reserved